Uncompromising Safety & Quality for Fast Paced Commercial Projects.
Improve quality, reduce project foot print, and increase productivity
- Pre-bent conduits
- Overhead racks/supports
- In-wall rough assemblies
- Custom wire reels
- Material kitting
- Material delivery break down
- Pre-whipped light fixtures
- Custom temporary power solutions
Benefits
Improved Safety
By bringing employees into a controlled atmosphere we reduce exposure hazards of an active construction site, and use equipment and tools that may not normally be available at the site to improve efficiency and safety.
Reduced Footprint
By reducing the number employees needed to be onsite we reduce the amount of ‘space’ Gurtz Interiors Group’ requires to perform the work. As space is always a premium on site this helps reduce clutter and waste on the project. It also allows us to increase our labor force without causing conflicts with other trades. It also helps us run a lean project, increasing ‘just in time deliveries’ and allowing for a ‘nothing hits the floor’ concept to become a reality
Reduce Installation Schedule
We no longer need to wait for other trades to complete their work before we can start building our rough infrastructure. This helps to decrease our installation time and allow for work to be performed more efficiently
Quality
Detailing the install off site helps for accurate material deliveries to the correct location time and time again. It increases fabrication quality, produces consistence, and allows for a more streamlined installation process.